Handing over modern factory - European standards at Phuoc Dong Industrial Park
On the morning of July 26, representatives of Saigon VRG Investment Corporation officially signed the handover of the Fischer 2 factory to Fischer Production Company Limited in Phuoc Dong Industrial Park.
The Fischer 2 factory project, invested by Saigon VRG Investment Corporation, has entered the completion phase and been handed over to investors. This is one of the typical custom-built factory projects of Saigon VRG in Phuoc Dong Industrial Park.
The Fischer 2 factory is part of a project to design and build a mechanical manufacturing plant implemented by Saigon VRG for a German enterprise, Fischer Production. Previously, we handed over the Fischer 1 factory to the investor for production operations.
>>See more news about Phuoc Dong industrial park
Fischer factory possesses a modern design according to European standards, multi-utility, ensuring construction quality factors and a fire protection system. The factory roof is designed with a natural light system to help save energy. Large production area, designed to optimize production capacity. The delivered factory is already connected to the infrastructure, investors only need to install the chain system, machinery and equipment to start operation and production immediately.
Custom-built factories are one of Saigon VRG's typical services that investors trust and choose. With a team of highly specialized and experienced engineers, we are ready to meet the needs of consulting on the design and construction of factory packages that best suit the investor's industry.
Businesses interested in custom factory construction services please contact the information below for the fastest advice!
Hotline: 0948 859 999
Phone: (028) 3847-9273
Email: info@saigonvrg.com.vn
- (05/02/2024)
- (25/12/2023)
- (17/11/2023)
- (30/10/2023)
- Phuoc Dong Industrial Park - Bright spot attracting investment in Tay Ninh (25/10/2023)
- (03/10/2023)
- (10/08/2023)
- (08/08/2023)
- (14/07/2023)
- (03/06/2023)
- (10/05/2023)
- (25/04/2023)
- (23/03/2023)
- (23/03/2023)
- (17/12/2022)
- Billion Industrial polyester film production project in Phuoc Dong Industrial Park (02/12/2022)
- Distribution warehouse of Thien Long in Binh Chanh Ho Chi Minh (19/11/2022)
- (19/09/2022)
- GreenFeed food processing factory at Phuoc Dong Industrial Park Tay Ninh (16/09/2022)
- (12/07/2022)